Ness Avenue Detours Ahead

businesswire – excerpt

SAN FRANCISCO–(BUSINESS WIRE)–HerreroBOLDT, general contractor of the Van Ness and Geary Sutter Health’s CPMC Campus, today announced the start of the next building phase: a 124-foot-long, 10-foot-wide and 10-foot-high pedestrian tunnel beneath Van Ness Avenue that will connect the future 274-bed hospital and medical office building.

This phase of construction will require temporary traffic restrictions on Van Ness Avenue between Ellis and Pine Streets, and a one block closure between Geary and Post. To expedite tunnel construction, HerreroBOLDT is working with the San Francisco Municipal Transportation Agency (SFMTA) and with Caltrans—which oversees the Van Ness Avenue/US 101 corridor. Closures will be either for partial limited nighttime work hours or for three full 72-hour weekends:

April 6 – April 9, 2015
04/06/15 at 11 p.m. until 04/07/15 at 6 a.m.
04/07/15 at 11 p.m. until 04/08/15 at 6 a.m.
04/08/15 at 11 p.m. until 04/09/15 at 6 a.m.

April 10 – April 12, 2015
Full 72-hour closure starting Friday at 12:00 a.m. until Sunday at 11:59 p.m.

April 24 – April 26, 2015
Full 72-hour closure starting Friday at 12:00 a.m. until Sunday at 11:59 p.m.
September 5 – September 7, 2015
Full 72-hour closure starting Saturday at 12:00 a.m. until Monday at 11:59 p.m.
(more)